Skip to content

Exterior · Rory

Decks that don't bounce, rot or wobble

A level, braced frame on proper footings, joists at the right spacing, and boards fixed with the gaps they need. Timber or composite, with steps and balustrades to suit.

Placeholder image: a timber deck

What's included

  • Ground cleared, then weed membrane and gravel underneath
  • Footings: concrete pads or ground screws, depending on the ground
  • Frame in treated C16 or C24 joists at the spacing the boards need
  • Noggins and bracing so the deck doesn't bounce
  • Softwood, hardwood or composite boards
  • Coated or stainless screws, and hidden fixings for composite
  • Fascia boards to finish the edges
  • Steps, balustrades and handrails
Placeholder image: hard landscaping detail

The process

How it goes

  1. Quote visit. Rory measures up, checks the levels and talks through boards and finishes.
  2. Clear. Ground cleared and levelled, membrane and gravel laid.
  3. Footings. Pads or ground screws set out and fixed.
  4. Frame. Joists levelled, fixed and braced.
  5. Boards. Laid with even gaps, cut and finished with fascias.
  6. Extras. Steps, balustrades and handrails, then a final check.

Typical timescales

Typical 3 × 4 m ground-level deck
2–3 days
Raised deck with steps and balustrade
4–5 days
Height above which most decks need planning permission
30 cm

Materials

Materials we use

  • Pressure-treated C16 or C24 joists, treated for ground contact (UC4) where they're close to the soil.
  • Jacksons Jakcured timber for a longer-life frame.
  • Treated softwood deck boards, grooved or smooth.
  • Composite boards from makers such as Millboard and Trex for low upkeep.
  • Concrete pad footings or ground screws.
  • Coated or stainless deck screws, and joist tape on composite builds.

Questions people ask

  • Timber or composite?

    Timber costs less and looks natural, but needs an annual clean and treatment. Composite costs more up front, doesn't need staining, and keeps its colour. We'll price both if you're undecided.

  • Do I need planning permission?

    Usually not, unless any part of the deck is more than 30 cm above the ground, or it's at a listed building or in a conservation area.

  • Is decking slippery?

    Any deck can get slippery in shade and wet weather if it isn't cleaned. Grooved boards, anti-slip inserts or composite boards all help.

  • How long does a deck last?

    A treated softwood deck on a good frame typically lasts well over a decade with yearly care. Composite needs less upkeep. The frame matters most, which is why we don't cut corners on it.

  • Can you build on a slope?

    Yes. A raised frame on taller posts or footings gives you a level deck. If it ends up more than 30 cm above the ground, we'll talk about planning.

Fancy a deck that feels solid underfoot?

Book a free visit. Rory will measure up and send a written quote for timber and composite.

Book a free quote visit