Exterior · Rory
Outside painting that lasts more than a summer
Render and masonry, timber windows and doors, fascias, garage doors and fences. Washed down, scraped back and repaired before anything's painted, with exterior paints made for the job.

What's included
- Safe access with ladders and towers, and scaffold hired in where it's needed
- Washing down, with a fungicidal wash on green growth
- Scraping back flaking paint, then filling and sanding timber
- Cracks in render raked out and filled
- Two coats of masonry paint on walls and render
- Timber: primer and undercoat where bare, then gloss, satin or a microporous finish
- Metal railings and gates: rust treated, then painted
- Paths, plants and windows protected while we work

The process
How it goes
- Quote visit. Rory looks at the surfaces, access and what's flaking or failing.
- Weather check. We book dry days and move them if the forecast turns.
- Wash and prep. Washed, scraped, filled and sanded.
- Prime. Bare timber, metal and repairs primed.
- Paint. Two coats, working with the sun rather than against it.
- Walk-round. We check it with you and touch up anything missed.
Typical timescales
- Front of a semi: render, fascias and front door
- 2–4 days
- Whole house exterior, weather permitting
- 1 week
- Best months for exterior painting
- Apr–Oct
Materials
Materials we use
- Masonry paint from Sandtex, Dulux Weathershield or Johnstone's Stormshield.
- Fungicidal wash before painting, so green growth doesn't come back through.
- Zinsser primers for problem surfaces.
- Microporous timber paints and stains, such as Sadolin and Dulux Weathershield, which let timber breathe.
- Direct-to-metal paint such as Hammerite for railings and gates.
- Exterior flexible fillers for timber and render cracks.
Questions people ask
When's the best time of year?
Spring to early autumn, on dry days without frost overnight. We avoid painting in direct, hot sun and keep an eye on the forecast.
How long will masonry paint last?
Most quality masonry paints are rated by their makers for 10 to 15 years, as long as the prep is done properly. That's why we spend so long on it.
Will I need scaffolding?
For most two-storey houses, ladders and a tower are enough. High gables or awkward roofs can need scaffold, which is shown on the quote.
Can you paint uPVC windows or doors?
It can be done with the right primer, but it's a specialist finish. We'll tell you honestly whether it's worth it for your house.
Do I need my neighbour's permission?
Only if we need to put ladders or a tower on their side. It's worth a quick word before we start, and we'll keep their side tidy.
Areas
External painting near you
Rory covers Stafford, Stone and the villages around them.
More exterior work
House front looking tired?
Book a free visit. Rory will look at the surfaces and access and send you an itemised quote.
Book a free quote visit