Exterior · Rory
Patios laid on a proper base
Natural stone, porcelain or concrete flags, bedded on full mortar over a compacted MOT Type 1 base, with falls that take water away from the house. The bit you can't see is why it lasts.

What's included
- Setting out, levels and falls, with the finished surface at least 150 mm below the damp-proof course
- Excavation and muck-away
- 100–150 mm of MOT Type 1 sub-base, compacted in layers
- Slabs bedded on a full sand and cement mortar bed, never dot-and-dab
- Slurry primer on the back of porcelain and sandstone so it bonds
- Joints pointed with a brush-in compound or a sand and cement mix
- Edging, steps and channel drains where the levels need them
- Cleaned down at the end, and sealed if you want it

The process
How it goes
- Quote visit. Rory measures up, checks levels and drainage, and brings slab samples if you're unsure.
- Written quote. Every stage itemised, including the waste.
- Dig out. Excavated to depth, with the spoil taken away.
- Base. MOT Type 1 laid and compacted with a plate compactor.
- Lay. Slabs bedded on mortar, checked for level and fall as we go.
- Point. Joints filled and the surface cleaned.
- Handover. We'll tell you when it's ready for furniture and how to look after it.
Typical timescales
- Typical 20 m² patio
- 3–5 days
- Large patio with steps or low walls
- 1–2 weeks
- Before heavy furniture goes on, while the mortar cures
- 48 hours
Materials
Materials we use
- MOT Type 1 crushed stone sub-base, compacted in layers with a plate compactor.
- 4:1 sharp sand and cement mortar bed under every slab.
- Indian sandstone. Riven, natural, and every slab slightly different.
- 20 mm outdoor porcelain. Hard-wearing, low-maintenance, laid with a slurry primer.
- Concrete flags from Marshalls or Bradstone for a cost-effective finish.
- Brush-in jointing compound such as Azpects EASYJoint, or a traditional sand and cement point.
Questions people ask
Porcelain or Indian sandstone?
Porcelain is very hard, resists stains and stays consistent in colour. Sandstone is natural, a little softer, and mellows with age. Porcelain costs more to lay because it needs a slurry primer and diamond cutting.
Why not just lay the slabs on sand?
Slabs on dry sand rock, sink and let weeds through. A full mortar bed on a compacted MOT Type 1 base is how you stop that.
Will I need drainage?
Every patio needs a gentle fall away from the house so rain runs off. If the water has nowhere to go, we add a channel drain or a soakaway, and it's shown on the quote.
Can the patio be level with my back door?
It has to sit at least 150 mm below the damp-proof course, roughly two bricks. If that leaves a step down from the door, we'll design a proper step in.
How soon can I use it?
You can usually walk on it after 24 hours. Give it 48 hours before heavy furniture or a barbecue.
Does a patio need sealing?
Not always. Porcelain doesn't need it. Sealing sandstone helps with stains but slightly changes the look, so we'll show you a sample first.
Areas
Patios near you
Rory covers Stafford, Stone and the villages around them.
Ready for a patio that stays put?
Book a free visit. Rory will measure up, check the levels and send you an itemised quote.