Exterior · Rory · Walton-on-the-Hill
Decking in Walton-on-the-Hill
Timber and composite decks on a properly braced, treated frame, built level and with the right gaps for drainage. Rory covers Walton-on-the-Hill and the villages around it, and quote visits are free.
Village on the south-eastern side of Stafford, between Baswich and Cannock Chase.
What's included
- Ground cleared, then weed membrane and gravel underneath
- Footings: concrete pads or ground screws, depending on the ground
- Frame in treated C16 or C24 joists at the spacing the boards need
- Noggins and bracing so the deck doesn't bounce
- Softwood, hardwood or composite boards
- Coated or stainless screws, and hidden fixings for composite
- Fascia boards to finish the edges
- Steps, balustrades and handrails

The process
How it goes
- Quote visit. Rory measures up, checks the levels and talks through boards and finishes.
- Clear. Ground cleared and levelled, membrane and gravel laid.
- Footings. Pads or ground screws set out and fixed.
- Frame. Joists levelled, fixed and braced.
- Boards. Laid with even gaps, cut and finished with fascias.
- Extras. Steps, balustrades and handrails, then a final check.
Typical timescales
- Typical 3 × 4 m ground-level deck
- 2–3 days
- Raised deck with steps and balustrade
- 4–5 days
- Height above which most decks need planning permission
- 30 cm
Materials
Materials we use
- Pressure-treated C16 or C24 joists, treated for ground contact (UC4) where they're close to the soil.
- Jacksons Jakcured timber for a longer-life frame.
- Treated softwood deck boards, grooved or smooth.
- Composite boards from makers such as Millboard and Trex for low upkeep.
- Concrete pad footings or ground screws.
- Coated or stainless deck screws, and joist tape on composite builds.
Decking in Walton-on-the-Hill?
Book a free quote visit with Rory. You'll only see his real free times.
Book a free quote visit