Exterior · Rory · Walton-on-the-Hill
Concrete bases in Walton-on-the-Hill
Reinforced concrete bases for garden rooms, workshops, garages and hot tubs, built to the load they'll carry. Rory covers Walton-on-the-Hill and the villages around it, and quote visits are free.
Village on the south-eastern side of Stafford, between Baswich and Cannock Chase.
What's included
- Setting out and levels
- Excavation to depth, with the spoil taken away
- Compacted MOT Type 1 sub-base
- 1200-gauge polythene damp-proof membrane
- Steel mesh reinforcement on spacers where the load needs it
- Ready-mixed concrete delivered, barrowed or pumped if there's no lorry access
- Tamped or float finish, with expansion joints on larger slabs
- Left to cure properly before anything heavy goes on

The process
How it goes
- Quote visit. Rory checks what's going on the base, the ground, and how a concrete lorry can get in.
- Set out and dig. Marked out, excavated and the formwork set to level.
- Sub-base and membrane. MOT Type 1 compacted, membrane laid.
- Reinforce. Steel mesh on spacers, if it's needed.
- Pour. Concrete placed, compacted and finished.
- Cure. Kept covered and left to harden before it's loaded.
Typical timescales
- Typical hot tub or garden room base
- 1–2 days
- Single garage base
- 2–3 days
- Curing before a filled hot tub goes on
- 7 days
Materials
Materials we use
- Ready-mixed C25 or C30 concrete, depending on the use.
- A142 or A193 steel mesh on spacers, so it sits in the slab rather than at the bottom.
- 1200-gauge polythene damp-proof membrane.
- MOT Type 1 crushed stone sub-base.
- Expansion joint filler board on larger slabs.
- Timber formwork, set to line and level.
Concrete bases in Walton-on-the-Hill?
Book a free quote visit with Rory. You'll only see his real free times.
Book a free quote visit